Page 1 of 1

Integration of new design with existing one

Posted: Sun Dec 22, 2024 9:33 am
by thouhidul32
The Camp Nou is one of the busiest stadiums in the world, with a capacity of 99,354 spectators. It is important that the renovation work does not interfere with any matches or events scheduled to take place at the stadium.


The new Camp Nou structure must be in harmony with korea phone number the stadium's historical structure and identity.

Compliance with the highest environmental standards
FC Barcelona aims to build an eco-friendly stadium that will reduce its environmental impact to a minimum.
Image


Camp Nou
Source: fcbarcelona
Thus, BIM technology is used to effectively perform 4 key tasks:

Development of a digital 3D model of the stadium
A detailed 3D digital model of the Camp Nou stadium was created, which includes all the information about the stadium’s structure, equipment and engineering systems. This model allows the design and construction teams to visualise the project in its entirety and work collaboratively with representatives of different disciplines.

Construction Simulation and Analysis
The BIM model is used to simulate the construction process, allowing potential problems to be identified and resolved before they occur on site. This helps avoid delays, cost overruns and quality issues.

Coordination of specialists at different stages
The BIM model serves as a centralized platform for coordinating the specialists involved in the project at different stages: architects, designers, builders and people from the operating organization. This helps to avoid errors and conflicts during design, and ensures that all teams work with the same information.

Project Information Management
The BIM model is used to manage all project information such as drawings, specifications and construction data, allowing teams to access the most up-to-date information anytime, anywhere.

Camp Nou as an example of using BIM in large-scale projects
The Camp Nou renovation project is an example of how BIM can be used to ensure the success of large projects and overcome the challenges that arise during their implementation. The effective use of BIM in this project has enabled FC Barcelona to build a modern and sustainable stadium that meets the highest expectations of its fans. The new stadium will be a benchmark for innovation, green building and efficiency, and will serve as an example for other infrastructure projects around the world.